Industrial park

Project nameIndustrial park
Industry classificationManufacturing industry
Basic information about the project
Project essenceThe industrial platform (on which some independent enterprises from one or different branches conduct the activity), includes the following objects: 1 . Complex on wood processing 2. Complex on round timber processing 3 . Shop on spill crushing 4 . Shop of pressing of wood 5 . Shop on production fuel pellets 6 . Furniture factory 7 . Paper-mill 8 . Office rooms 9 . Trade gallery
Project capacity1 . Complex on wood processing: the area of production rooms Ц 14 000 sq.m, warehouse Ц 1 500 sq.m. 2 . Complex on round timber processing: the area of production rooms Ц 13 700 sq.m, warehouse Ц 1 600 sq.m. 3 . Shop on spill crushing: the area of production rooms Ц 14 000 sq.m, warehouse Ц 1 350 sq.m. 4 . Shop of pressing of wood: the area of production rooms Ц 13 800 sq.m, warehouse Ц 1 300 sq.m. 5 . Shop on production fuel pellets: the area of production rooms Ц 15 000 sq.m, warehouse Ц 1 650 sq.m. 6 . Furniture factory: the area of production rooms Ц 17 550 sq.m, warehouse Ц 2 150 sq.m. sq.m, warehouse Ц 1 300 sq.m. 7 . Paper-mill: the area of production rooms Ц 15 100 sq.m, warehouse Ц 1 500 sq.m. 8 . Office rooms: the 4-storeyed building total area Ц 60 000 (15 000) sq.m, including the area leased Ц 52 800 (13 200) sq.m. 9 . Trade gallery: the 3-storeyed building total area Ц 45 300 (15 100) sq.m, including the area leased Ц 40 200 (13 400) sq.m.
Consumer market descriptionMain groups of consumers are citizens of the city
Object construction term3.00
Competitive advantageProfitable geographical location of immovable property
Resource availability for project realizationInvestorТs resources
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh250.00
Planned volume of gas consumption (annual), million cubic meters0.00
Planned volume of water consumption (annual), million cubic meters122.20
Degree of project developmentBusiness plan is developed
Financial estimation of the project
Total cost of the project, mln rubles3591.81
Own resources, million rubles0.00
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles3591.81
Conditions of investor participationDirect investments
Form of investments returnTerms of money
Payback period6.25
Basic indicators of investment project economic efficiency
Net present value (NPV)966.19
Simple payback time6.25
Discounted payback period8.25
Internal rate of return (IRR)13.64
Productivity index (PI)1.11
Income per year 1873.54
Social efficiency of investment project
Number of workplaces90
Salary average level (thousand rub per year)268.67
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles474.24
which includes into consolidated budget of the krai, million rubles323.52
General information about the ground area
Address of the areaNovorossiysk, Raevskaja
Cadastre account of ground areaRegistered
Cadastre number of area/of quarter23:47:0103001
Declared area (m2)223000.00
Limit size of the area (m2)223000.00
Land categoryLands of inhabited localities
Kind of allowed useProduction
Actual useNon-build up territories
Availability of buildings, structures, constructionsNo
Permits, town-planning documentationThe Rules of land use and development of Novorossiysk city
Information about proprietor (right holder)
ProprietorAdministration of Novorossiysk city
Right holderAdministration of Novorossiysk city
Kind of rightConstant (termless) using
Information about encumbrance and limitation
Kind of encumbrance, limitationNo
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)Own energy station
Power supply center (electrotension class)Middle class of tension Ц from 1 kV to 35 kV
Power supply center (free power (MWt))2.50
Power supply center (distance(m))500.00
Nearest connection point (network tension, kV)0.00
Nearest connection point (distance(m))500.00
Gas-supplying
Gas pipeline (name, right-holder)From projected GPL
Gas pipeline (diameter(mm))0.00
Gas pipeline (pressure(MPa))Average pressure pipelines Ц from 0,005 to 0,3
Gas pipeline (carrying capacity(cube. m.in a year))0.00
Gas pipeline (distance(m))2000.00
Nearest connection point (diameter(mm)).00
Nearest connection point (pressure (MPa))Average pressure pipelines Ц from 0,005 to 0,3
Nearest connection point (carrying capacity (cubic meter a year))0.00
Nearest connection point (distance(m))2000.00
Water-supply
Water supply source (name, right-holder)Own 2 well
Water supply source (power (cubic meters a day))122.00
Water supply source (quality of water)Service and drinking water
Water supply source (distance(m))250.00
Nearest connection point (power (cubic meters a day))122.00
Nearest connection point (diameter(mm))0.00
Nearest connection point (distance(m))250.00
Sewage system
Type of building (name, right-holder)Local facilities treatment
Type of building (power (cubic meters a day))122.00
Type of building (distance(m))250.00
Nearest point of connection (power (cubic meters a day))122.00
Nearest point of connection (diameter(mm))0.00
Nearest point of connection (distance(m))250.00
Installation of telephones/internet
Central network (distance(m))250.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub135.00
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation Novorossiysk city15.00
nearest settlement Raevskaja village0.00
Center of federal subject Krasnodar city140.00
highways (regional, federal value) Novorossiysk city - KerchТs strait5.00
highways of local value -5.00
nearest railway station Rail station Verhnebakanskaya20.00
nearest railway Ubyh farm20.00
airport Anapa airport30.00
seaport seaport Novorossiysk20.00
Additional information about the ground area
Special conditionsBackground seismicity of Novorossiysk city is 8-point. The seismicity of the land account as 8-point.
Cost of rent/buy of the ground area, mln. rub142.00
Geographical coordinates of object (dd.dddddd)
Latitude (N)44.43000000
Longitude (E)37.46000000
NotesInvestment project is to be realized for the purposes not to be conflict with town-planning regulations established for the present territory
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameAdministration of municipal administration city of Novorossiysk - First deputy head municipality Novorossiysk I.A.Dyachenko
Postal address18 Sovetov st., Novorossiysk, Krasnodar region, Russia, 353900
Sitewww.investnovoros.ru
Phone/fax+7 (8617) 646727
E-mail addressnovorosinvest@mail.ru
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipal administration city of Novorossiysk
Postal address353900, Krasnodar Region, Novorossiysk, Sovetov St., 18
Sitewww.investnovoros.ru
Phone/fax+7 (8617) 646727
E-mail addressnovorosinvest@mail.ru
Executive (Full name, work position, phone number)Ukolova K.G.